[ what you get ]
- A load curve built from the plant, not the sanction letter
- A sized system with generation and savings modelled month by month
- A tender-ready specification
- A subsidy and metering route, with its conditions written down
[ consulting — 06 ]
A refrigeration load runs in daylight and never really stops — which makes it either an unusually good solar match or an expensive mismatch, depending entirely on whether anyone modelled it. We size rooftop and ground mount against compressor duty cycles rather than connected load, and against your tariff rather than a national average.
[ what usually goes wrong ]
Solar gets sized against the sanctioned connected load, or against a rooftop area, or against whatever the EPC’s standard package happens to be. None of those is your consumption curve, and the difference between them is the whole payback. It shows up on the first bills after commissioning — the units generated look about right, the demand charges have not moved, and the number on the meter is not the number in the proposal.
[ what we do ]
The sequence is the method. Most of what goes wrong on projects like these is a step taken before the one that should have informed it.
We build the real load curve from the plant — compressor duty cycles by season, not the connected load on the sanction letter.
We size the array against that curve and your tariff structure, including demand charges and any time-of-day slabs, and we state the payback honestly, including when it does not clear.
We settle net metering, captive or open access on your state’s rules, which is where most of the value is won or lost.
We specify and tender it so more than one EPC can bid the same scope, and the quotes can actually be compared.
We read the subsidy layer — the UP policy carries 50% on rural solar plants up to 75 kVA and 90% for women entrepreneurs; PM-KUSUM covers the pumping and grid-connected components under its own rules and deadlines.
[ what you get ]
[ what it touches ]
PM-KUSUM Components A, B and C; state solar policy and net metering rules; and state food processing policy where it carries a solar line. Deadlines here move — PM-KUSUM’s has been extended to 31 March 2027 for projects meeting the PPA condition — so we check them at the time, every time, rather than quoting last year’s summary.
The scheme table[ who this isn’t for ]
Anyone who wants panels on a roof because it looks responsible. And anyone whose load sits mostly after dark: on a flat tariff with no demand charge worth attacking, that is a storage question, not a solar one, and we will not dress it up as one. If the numbers do not clear at your tariff, we say so and point you somewhere better. No stringing along.
[ what happens next ]
The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.
We reply in writing within three working days
[ the rest of it ]
Central and state scheme applications for food processing and cold chain projects.
Cold store, frozen store and refrigeration system design — load first, building second.
IQF and processing line design, balanced from intake to packing.
Packhouse layout, pre-cooling, grading, ripening and dispatch — sized to the harvest peak, not to a supplier’s quote.
Procurement on the intake side, buyers and distribution on the output side.
Process automation, control systems, and the mechanisation sequence that scales.