[ consulting — 04 ]
The half-hour after harvest decides the next 30 days.
Reception, pre-cooling, grading, ripening chambers, staging and dispatch — laid out so material flows one way, clean never crosses dirty, and the cold chain does not break in the last 20 metres. We size the pre-cooling to the real harvest peak and the ripening to the crop. We take no commission from any equipment brand, so the specification answers to the produce rather than to a catalogue.
[ what usually goes wrong ]
Field heat. Produce goes from the field to a truck to a store that was never designed to remove that much heat that fast, and the shelf life is gone before anything has been stored at all. Pre-cooling gets treated as an extra room rather than as the step the whole cold chain is built on, and the cold store then spends the season fighting a heat load it was never sized for. Then the layout: dirty crates crossing finished cartons, one door for everything, staging in whatever space is left. That reads as a saving on the drawing. One buyer audit later it is a commercial problem.
[ who this isn’t for ]
Anyone looking for the cheapest shed that will pass a subsidy inspection. Those get built. They do not get used, and we will not draw one. Nor is it for a project already tendered, where what is wanted is a signature on someone else’s layout. If that is the job, we say so and point you somewhere better.