The half-hour after harvest decides the next 30 days.

Reception, pre-cooling, grading, ripening chambers, staging and dispatch — laid out so material flows one way, clean never crosses dirty, and the cold chain does not break in the last 20 metres. We size the pre-cooling to the real harvest peak and the ripening to the crop. We take no commission from any equipment brand, so the specification answers to the produce rather than to a catalogue.

[ what usually goes wrong ]

Field heat. Produce goes from the field to a truck to a store that was never designed to remove that much heat that fast, and the shelf life is gone before anything has been stored at all. Pre-cooling gets treated as an extra room rather than as the step the whole cold chain is built on, and the cold store then spends the season fighting a heat load it was never sized for. Then the layout: dirty crates crossing finished cartons, one door for everything, staging in whatever space is left. That reads as a saving on the drawing. One buyer audit later it is a commercial problem.

[ what we do ]

In this order.

The sequence is the method. Most of what goes wrong on projects like these is a step taken before the one that should have informed it.

  1. 01

    We design one-way flow first, because every other decision is downstream of it: reception, tipping, washing, grading, sizing, packing, staging, dispatch — clean never crossing dirty, people never crossing product, and no shortcut that depends on the rule being remembered on a busy morning.

  2. 02

    We size pre-cooling for the actual harvest peak rather than the annual average — forced air, hydro or vacuum, chosen by commodity and by the pull-down time the crop needs, not by what the last plant in the district installed.

  3. 03

    We specify ripening chambers only where the crop calls for them, with ethylene dosing, circulation and the safety interlocks that go with a flammable gas in a sealed room.

  4. 04

    We match dispatch staging and reefer docking to the real vehicle turnaround — how many trucks, how long they wait, and what the dock does to the product while they do — so the cold chain holds through the last 20 metres.

  5. 05

    We lay out for the grading and traceability the buyer will eventually demand, even if today’s buyer does not — and we say where that costs money now, so it is your decision rather than a surprise.

[ what you get ]

  • Packhouse layout drawings, with flow and zoning marked
  • Pre-cooling sizing by commodity and harvest peak
  • Ripening chamber specification, where the crop needs one
  • Dock, staging and reefer turnaround design
  • An equipment schedule and a capex model you can tender against

[ what it touches ]

AIF explicitly covers packhouses, sorting and grading units and ripening chambers. MIDH and state horticulture schemes commonly cover integrated packhouses. Export routes bring APEDA registration and buyer protocols with them. We check each of those against your project before it shapes the drawing, because a layout bent to fit a scheme you turn out not to qualify for is worse than one that was never bent at all.

The scheme table

[ who this isn’t for ]

Anyone looking for the cheapest shed that will pass a subsidy inspection. Those get built. They do not get used, and we will not draw one. Nor is it for a project already tendered, where what is wanted is a signature on someone else’s layout. If that is the job, we say so and point you somewhere better.

[ what happens next ]

Tell us what you’re trying to build.

The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.

Tell us the problem

We reply in writing within three working days

[ the rest of it ]