Sized for what you will actually store. Not for what fits the plot.

Capacity, chamber split, insulation, refrigerant choice, heat load, pull-down time, standby. We argue ammonia, CO₂ or F-gas on your load profile and your tariff, rather than defaulting to whatever the last contractor built.

[ what usually goes wrong ]

India has a great deal of subsidised cold storage running at a fraction of capacity, in the wrong place, at the wrong temperature, for a crop with one eight-week season. Capacity was decided by the plot and the subsidy cap. Nobody modelled what would be in it in March.

[ what we do ]

In this order.

The sequence is the method. Most of what goes wrong on projects like these is a step taken before the one that should have informed it.

  1. 01

    We build the load profile first — what is stored, at what temperature, arriving how fast, held how long, month by month across a full year.

  2. 02

    We size the chambers around that: the split between chilled, frozen and staging, and the chamber you should not build yet.

  3. 03

    We choose the refrigerant on your load profile and your tariff — ammonia, CO₂ or F-gas — with the safety and statutory implications of each stated up front rather than discovered later.

  4. 04

    We calculate heat load properly: transmission, product, respiration, air change, people, lights, motors, defrost. Then we size compressors, condensers and evaporators against it, with honest standby.

  5. 05

    We specify insulation, doors, air curtains, drainage and the floor — the things that are cheap to get right and ruinous to retrofit.

[ what you get ]

  • Chamber layout and general arrangement drawings
  • A heat load calculation you can hand to any engineer
  • Equipment schedule and single-line diagram
  • Capex model, and a monthly opex model at your tariff
  • A pull-down acceptance test to hold the contractor to

[ what it touches ]

NHB capital investment subsidy, PMKSY cold chain, AIF, and state policy. Ammonia installations carry statutory and safety obligations — PESO approval where applicable, plus an operator competence question that is not optional. We write both into the scope rather than leaving them to be found at commissioning.

The scheme table

[ who this isn’t for ]

Anyone who has already signed a turnkey contract and wants a second opinion to wave at the vendor. We decline that work. By then capacity, refrigerant and chamber split are decided, and a report saying so is leverage in an argument, not engineering. Come before the order is placed — after it, there is nothing left to size.

[ what happens next ]

Tell us what you’re trying to build.

The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.

Tell us the problem

We reply in writing within three working days

[ the rest of it ]