Yield is the number. Everything else is throughput theatre.

Washing, blanching, dewatering, freezing, grading, metal detection, packing — designed as one line rather than bought as eight machines. We find where the yield leaks, why it leaks worse in the third hour of a shift, and what a realistic TPD is for your raw material rather than for the brochure’s.

[ what usually goes wrong ]

A line is bought on rated TPD. Rated TPD assumes an ideal raw material at an ideal size at an ideal feed rate, and your peas are not that. Real output is set by the slowest station and by how much product the line destroys on the way through. Two lines with the same rating can differ by several points of yield, and several points of yield is the entire margin.

[ what we do ]

In this order.

The sequence is the method. Most of what goes wrong on projects like these is a step taken before the one that should have informed it.

  1. 01

    We start at the raw material rather than the machine — variety, size distribution, seasonality, arrival condition, and what your growers can realistically deliver in a bad week as well as a good one.

  2. 02

    We balance the line station by station — reception, washing, sorting, cutting, blanching, cooling, dewatering, freezing, grading, metal detection, weighing, packing — and name the constraint before you buy around it.

  3. 03

    We size the freezer against actual product load and residence time rather than nameplate, then check the refrigeration plant can carry it alongside the stores it already serves.

  4. 04

    We design for the changeover, the clean-down and the third hour of a shift, because that is where designed yield and real yield separate.

  5. 05

    We specify the quality gates and the records an FSSAI inspection, a buyer audit or an export certification will ask for — written before the line is built, not reconstructed after it.

[ what you get ]

  • Line layout with material flow
  • Station-by-station capacity and balance, with the constraint named
  • Freezer load calculation against real product load and residence time
  • An equipment specification written so more than one vendor can quote it
  • A yield model with its assumptions exposed rather than buried

[ what it touches ]

PMKSY unit scheme and cold chain, AIF, and state policy. FSSAI licensing and the Schedule 4 requirements that come with it; HACCP and the buyer or export certifications your market demands. We write the quality gates and the record trail to those requirements while the line is still on paper, because a record trail retrofitted into a running line satisfies nobody.

The scheme table

[ who this isn’t for ]

Not for anyone whose raw material supply is not yet solved. A line without a reliable intake is an expensive shed, and we will not draw one — we say so and point you at the linkages work first. Nor for a project whose machine list is already signed: by then the yield decisions are made, and a line balance is a post-mortem.

[ what happens next ]

Tell us what you’re trying to build.

The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.

Tell us the problem

We reply in writing within three working days

[ the rest of it ]